O ur experts  provided  the  NATO  with a Tier  3

             hardened C2 facility design intended to resolve
 security,  health  &  safety  and  capacity  issues  of  the
 existing building and the design for a Back-up Power
 Station,  two sport  fields and  other refurbishment  of
 surrounding external areas.
 Due to the threat in the area, blast assessments have
 determined the design and the dimensions of
 structural elements of the building, the thickness of
 external walls and of the roof slab.
 While the roof floor has been arranged to
 accommodate HVAC equipment, the other floors have
 been arranged  into five different functional areas:
 working  areas  (shared  and  single  office),
 14  support/service  areas,  connection/circulation  areas,                                        15
 toilets and system areas. Special systems included:
 Fire detection and alarm and Public Address systems,
 Access Control System, CCTV and Intrusion
 Detection Systems, Anti-flooding systems, BMS.













                                                   TIER 3 HARDENED RS HQ C2 FACILITY


                                                                              Kabul, Afghanistan